Request an estimate

An extra estimator, when you need one

We work alongside your team, not instead of it. Send the jobs your estimators don't have time for, or a price you want checked before it goes in.

Estimating

A priced estimate built on your BOQ and drawings, tailored to your requirements, with quantities, rates and assumptions shown for every line.

Programme, included

Every estimate comes with the programme behind it: durations, crew and plant, so you can see the productivity the rates assume.

Methodology, on request

Where a tender asks for one, we can write the construction methodology from your drawings and the specification. Quoted separately.

What drives the fee

  • Rate-drivenOne discipline, production rates we already hold. Wet services, or a cart, haul and place grader package. Quantities against known rates, with the programme behind them. Where a job sits in the range depends on the number of disciplines and the complexity of the work: a smaller subdivision sits towards the lower end, and work within a road corridor or around live services towards the top.
    $750 to $1,500
  • Build-up drivenSeveral disciplines and the interfaces between them, built up line by line.
    $1,800 to $3,500
  • Method-drivenProduction rates or access requirements drive the rate, so we work through them with you and agree them first, in a scoping workshop, before doing anything else.
    Workshop $650

The workshop gives you a method statement and a firm fee for the estimate. Proceed and the $650 comes off that fee in full.

Priced separately

  • Take-off where there is no BOQQuoted at the scope check
  • Response schedules and other non-price submission documentsPer schedule
  • Construction methodology as a standalone documentQuoted
  • Express turnaround1.5 times the fee

A response schedule runs anywhere from two hours to two days depending on the template you are handed, so it is priced on its own rather than buried in the estimate fee.

What moves a job up a band

  • How many disciplines sit in the scope
  • Live traffic, staging or road occupancy
  • Erosion, sediment and environmental controls
  • Ground conditions and groundwater
  • Access and working hour restrictions
  • Documentation the tender asks for beyond the price

Read your own job down this list and you will know roughly which band it sits in before you send it to us.

See what you get

Extracts from a synthetic example project: a 180 m local road with a 7 m carriageway. The estimate and programme come as standard; the methodology is provided on request.

Example Road, stage 1Extract, excluding GST

ItemQtyUnitRateAmount
Site establishment and disestablishment1item18,500.0018,500.00
Clear and grub2,340m²3.207,488.00
Bulk earthworks, cut to spoil1,450m³28.0040,600.00
Subgrade trim and compact1,440m²5.507,920.00
Select fill, CBR15, 300 mm432m³68.0029,376.00
Subbase, CBR45, 200 mm288m³105.0030,240.00
Base, CBR80, 150 mm216m³128.0027,648.00
Prime and primerseal1,260m²8.2010,332.00
Asphalt AC14, 40 mm1,260m²42.0052,920.00
Barrier kerb and channel360lm78.0028,080.00
Subsoil drain, 100 mm360lm56.0020,160.00
Stormwater, 375 RCP185lm385.0071,225.00
Direct cost344,489.00
Site overheads, time related and fixed
Project management and site supervision8wk4,850.0038,800.00
Site office, amenities and services8wk1,150.009,200.00
Traffic management, signage and shuttle8wk2,950.0023,600.00
Survey set-out and as-constructed1item9,800.009,800.00
Testing, NATA and lot conformance1item7,400.007,400.00
Environmental controls and maintenance1item6,900.006,900.00
Site overheads95,700.00
Direct cost and site overheads440,189.00
Corporate overhead, 5.0%22,009.45
Company profit, 9.0%41,597.86
Sell total, excluding GST503,796.31